What is the best way to determine a level line on the exterior of your house over 20 to 50 feet.
Leveling siding starter strip.
Required accessory for starting a vinyl siding job constructed of low maintenance durable vinyl.
This is where the new siding will begin.
Georgia pacific 3 5 in x 10 ft galvanized steel galvanized steel vinyl siding starter strip.
A water level is simply a clear plastic hose or regular hose with clear ends with water in it.
To establish a level line around a building you ll need a surveyor s level an accurate laser level or a water level.
This way you will always end level with your soffit.
It s designed to work with most sidings.
Then find your lowest point of the home.
Snap a level chalk line for the first starter strip at the base of the wall no less than 8 inches above ground level after determining the lowest corner of the house.
Below the top of the foundation but the lower the vinyl siding is installed the better.
Remember to make sure the sheathing is smooth before you apply the siding so the siding can be smooth also.
A hand level won t cut it and how do you level a chalk line.
A line level isn t accurate enough.
You will still be able to attach it to the wall sheathing.
Description documents this vinyl starter strip is used prior to installing the first row of siding and helps keep siding level and straight.
Starter strip is used at the bottom of each side of the home to lock the first course of siding in place.
You attach the bottom of the first row of siding to the top of this starter strip.
If it is only 1 to 2 inches out of level this should not matter because most starter strip is 3 1 2.
Cellwood vinyl starter strip is a required accessory to start any vinyl siding installation job.
It protects the sheathing from rain snow and pests.
This chalk line should be level and a consistent distance from the eaves or the top and bottom of the windows.
Pull a measurement down from the soffit.
Vinyl siding starter strips.